The Walk-In Shower Conversion: Costs, Timelines and the Decisions That Matter

Replacing a bath with a walk-in shower is one of the most requested bathroom projects. The order of decisions matters more than the tile.

Nora Castellane
Nora CastellaneRenovation editor · October 16, 2026 · 7 min read
Modern curbless walk-in shower with a frameless glass panel

Somewhere in most houses there is a bath that nobody has filled in years. It is used as a shower, stepped over twice a day and quietly resented. Replacing it with a walk-in shower is one of the most satisfying bathroom projects, and one of the easiest to get wrong.

The visible choices, tile and taps, come last. The decisions that determine whether the shower works are made in the first hour.

Decide what walk-in means to you

The term covers everything from a low-threshold tray with a glass door to a fully level, doorless wet area. They differ a great deal in cost and complexity.

A low-profile tray has a small lip a few centimetres high. It is the simplest conversion, fits the footprint of a standard bath and needs little change to the floor.

A curbless shower has no step at all. The bathroom floor continues straight in and slopes gently to the drain. It looks superb and is the best choice for anyone planning to stay in their home as they age, but the floor structure usually has to be altered to create the slope.

TypeThresholdFloor workRelative cost
Prefabricated tray and surroundLow lipMinimalLowest
Tiled shower with curbSmall stepModerateMedium
Curbless tiled showerNoneSignificantHighest

Check the drain before anything else

A bath drain sits at one end and is typically smaller than the drain a shower requires. Moving or enlarging it is routine plumbing, but it affects the budget and sometimes the ceiling of the room below.

Ask your contractor where the drain will go and how the floor will slope towards it. Linear drains along one wall allow large tiles and a single, simple slope.

Waterproofing is the whole job

Tile and grout are not waterproof. They are a decorative surface over the layer that actually keeps water out. That layer, a membrane applied to the walls and floor, is the most important part of the project and the part you will never see again.

You are not paying for tile. You are paying for what is behind it.

Ask which waterproofing system will be used and whether the shower floor will be flood tested before tiling. A careful installer fills the base with water and leaves it for a day to prove it holds.

Plan for what you might need later

While the walls are open, adding solid timber blocking between the studs costs almost nothing. It lets you fix a grab bar or a fold-down seat securely at any point in the future.

  • Blocking for grab bars at the entry and beside the controls.
  • Controls placed where you can reach them without getting wet.
  • A hand shower on a sliding rail as well as a fixed head.
  • A recessed niche for bottles, on a wall away from the spray.
  • Slip-resistant floor tile, rated for wet areas.

Glass, or no glass

A single fixed glass panel is the simplest enclosure. It has no moving parts, is easy to clean and keeps most of the spray contained if the shower is deep enough.

Doorless designs need space. As a rough guide, a shower shorter than about five feet will let water escape without a door. In a standard bath alcove, a hinged or sliding door is usually the practical answer.

Where the money goes

Costs vary widely with region and finish. A prefabricated kit in the existing footprint can be a few thousand dollars installed, while a custom tiled, curbless shower with a frameless enclosure can run well into five figures.

Where the budget typically goes in a tiled conversion
Labour
45 %
Tile and materials
22 %
Glass enclosure
13 %
Fixtures and valve
12 %
Waterproofing system
8 %
Illustrative split. Your quote will differ.

Labour is the largest share because the work involves several trades in sequence: demolition, plumbing, carpentry, waterproofing, tiling and glazing.

How long it takes

A straightforward conversion with a prefabricated base can be finished in two or three days. A tiled shower takes longer because each layer needs time to cure before the next goes on.

Custom glass is measured only after the tile is finished and usually takes one to three weeks to arrive. The shower can often be used with a temporary curtain in the meantime.

The resale question

Estate agents often suggest keeping at least one bath in a home, particularly where buyers are likely to have young children. If this is your only bath, weigh that against how long you plan to stay.

If there is another bath elsewhere in the house, converting this one is rarely a concern.

Ask for the waterproofing product and the flood test to be written into the quote. It signals that you understand what matters, and it gives you something to point to if a problem ever appears.

Choosing who does it

Look for a contractor who talks about slope, membranes and drains before tile patterns. Ask to see a shower they built several years ago, not one finished last week.

Get the scope in writing, including who supplies fixtures and what happens if hidden damage is found under the old bath.

The first morning

Done properly, a walk-in shower is the kind of improvement you notice every single day. No step, no curtain clinging to your leg, more light in the room.

Spend your attention on the parts you cannot see, and the parts you can will look after themselves.

Nora Castellane
Nora CastellaneNora writes about kitchens, bathrooms and floors, and believes most renovation regret comes from decisions made in a hurry.

Newsletter

The Home Current letter

One genuinely useful guide about home improvement, renovation and everyday comfort, sent weekly. No spam, and you can unsubscribe at any time.

Keep reading